Threeway Steel-Seamless Steel Pipe, ERW Steel Pipe, LSAW Steel Pipe, SSAW Steel Pipe
Contact Us
Seamless Steel Pipe,ERW Steel Pipe,LSAW Steel Pipe,SSAW Steel Pipe,

Threeway Steel Co., Ltd

E-mail: sales@srtsteelpipe.com

Address: 22nd Floor, Royal Wing Tower, Long Champ International Building, No.9 Xiangfu Road, Changsha, Hunan, China, PC: 410116

Phone:0086-731-8873-9521  

Home - NewsNews Center

Spiral Submerged Arc Welded Pipes

Keywords :        Update : 2017-01-11        View(s) : 3095

Spiral welded pipe production by submerged arc method is based on using tandem welding technique for joining inside and outside coil edges, which have been trimmed and beveled by carbide milling for high quality weld structure. Welding of hot rolled steel coils takes spir...

Letter of thanks from Shinestar Group Chairman in Chinese New Year

Keywords :        Update : 2017-01-11        View(s) : 3547

Dear distinguished customers, colleagues and friends, Trickling summed up a magnificent sea; ordinary footsteps, after the great journey. In the inspiration of centuries dream, in the endeavor of thousands of employees,  Shinestar acrossed 2016 firmly and stably. Over ...

Surface Treatment of SAWH Steel Pipe

Keywords :        Update : 2017-01-10        View(s) : 3164

1, clean Used solvent, emulsion clean steel appearance, to get to remove oil, grease, dust, smooth agent and similar organic matter, but it means less steel appearance of rust, scale removal, welding flux, etc., thus the tricks only as adjuvant in corrosion produced. 2, derusting Primary ...

SSAW Stocklist New Quotation on January 11th, 2017

Keywords :        Update : 2017-01-10        View(s) : 3047

Item  Des Standard Material Size Quantity Remark FOB CHINA Dia(mm) T...

Handling Vehicle Requirements of SAWH Steel Pipe

Keywords :        Update : 2017-01-09        View(s) : 3051

Handling vehicle requirements of sawh steel pipe : 1, State regulations spiral steel pipe bulk manner. If the client requests balers can consider, as appropriate, but must 159MM diameter to 500mm between the bale packaging material strip and fastened, each should be twisted into at least two,...

Page(s):  1 ... 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 ... 499