First, pre-installation preparation:
The pipe trench must be dug, the pipe well must be constructed, and all necessary spiral welded steel pipes and tools, including welding machines, cutting machines, electric hammers, polishing machines, etc., must be fully prepared. Installation can only begin after these preparations are completed.
Second, installation:
Based on the design drawings and site conditions, prefabricate the pipe supports. Then, punch the pipes according to the design and site conditions. Polish the trench with a polishing machine, and then weld.